Date of Defense
12-9-2015
Date of Graduation
12-2015
Department
Civil and Construction Engineering
First Advisor
Yufeng Hu
Second Advisor
Decker Hains
Abstract
This report presents the site layout alternatives for the development located at the corner of Drake and Stadium in Kalamazoo, Michigan. In the report four different layouts are suggested and followed by best management practices for grading and earthwork plans, porous asphalt pavement design, storm water retention design for the proposed site, and storm sewer pipe design. The redesign of the Costco Development Site aims to maximize efficiency of the development area through the warehouse and gas station location, parking lot layout, and trucking routes. Grading design is developed based on the existing site conditions before construction took place. The storm water retention design for the Costco watershed is utilized for an onsite retention basin, bioinfiltration systems, porous asphalt pavement, and an oil separator in order to minimize cost and maximize sustainability.
Recommended Citation
Rahimi, Ahmad Sear, "Site Development at the Corner of Drake and Stadium" (2015). Honors Theses. 2649.
https://scholarworks.wmich.edu/honors_theses/2649
Access Setting
Honors Thesis-Open Access