This project addressed the replacement of a culvert crossing Wabascon Creek along North Mason Avenue in Battle Creek, Michigan. Following significant flooding caused by snowmelt in 2023, the existing wooden box culvert—originally constructed in the 1960s—sustained damage when inlet wingwalls detached from the structure, requiring temporary repairs. Design alternatives were developed to provide a durable and reliable replacement, incorporating structural, water resources, transportation, and construction engineering considerations. The design process also addressed environmental sustainability requirements, cost-effectiveness and constructability. Final deliverables included engineering calculations, plans and specifications, a cost estimate and a project schedule to support implementation of a resilient long-term solution.

Comments

Co-authored with:

Nick Fannon

Nolan Van Loo

Access Setting

Honors Thesis-Open Access

Senior Design Presentation_FINAL.pdf (4044 kB)
Presentation

Share

COinS